The Department of Transport is upgrading services and amenities at Fremantle Fishing Boat Harbour to provide a better experience for harbour users and visitors.
HV Electrical upgrade
In July 2020, the State Government announced funding for the Fremantle Fishing Boat Harbour (FFBH) electrical upgrade as part of the $5.5 billion WA Recovery Plan.
Electrical infrastructure at the harbour had not been upgraded since around 1985, leading up to the America’s Cup defence, and needs replacement to support the many and varied activities at the harbour.
The planned upgrade of electrical infrastructure will provide significant benefits, including:
- a more reliable and robust electrical supply for tenants,
- enhanced operational safety for maintenance crews,
- additional capacity to future proof the harbour’s electricity supply; and
- enable on-site renewable energy generation.
The Department of Transport (DoT) manages FFBH and is responsible for providing and maintaining the electrical infrastructure. The electrical upgrade will create a safer network with improved capacity powering operations at the harbour for decades to come.
Project funding totals $7.8 million.
Project status
DoT has completed significant planning activities for the project, including consultation with key stakeholders, engineering surveys and detailed design work.
WA based contractor Ertech was awarded a design and construct contract in October 2024 to deliver the major electrical upgrade.
Construction activities are expected to be completed in late 2025. To minimise disruption DoT is delivering the works outside of the peak periods in the busiest parts of the harbour.
The project involves:
- Trenching and installation of underground electrical services along Mews Road from Sardine Wharf to Be Apartments
- Installation and commissioning of electrical equipment including a new substation at Sardine Wharf, external Ring Main Units, and transformer
- Installation of kerbs and islands in Sardine Wharf car park
- Pavement reconstruction along Mews Road following installation of underground electrical services, including asphalt surfacing.
What to expect:
- Work will be carried out between 7am and 6pm on weekdays except public holidays
- Occasional out of hours work will be undertaken, for example where power outages are required. Advance notice will be given of these works.
- There will be no road closures, but some disruptions, such as noise and temporary traffic adjustments including lane closures, will occur. A certified traffic control company has been engaged to oversee traffic management for this project.
- The laydown area for the work will be located at the Sardine Wharf car park resulting in a reduction of available parking spaces.
For more information, please contact DoT as follows:
- Email: ffbhelectricalupgrade@transport.wa.gov.au
- Phone: 1300 963 733
Work zone map
Jetty replacement
In 2021, DoT committed to the first stage replacement of Jetty 3 at Fremantle Fishing Boat Harbour (FFBH) as, as part of its ongoing Maritime Facilities Program.
The jetty has reached the end of its serviceable life and will be replaced with a modern floating pen system to accommodate 45 new modern berths.
Project status
The tender process for the design and construct contract is complete and a $14 million contract to undertake jetty renewal projects at both Hillarys Boat Harbour and FFBH has been awarded to GTS Australia.
Most of the work at FFBH will be completed by mid to late 2023 to limit disruption to current penholders and harbour operations.
Penholder facility and services upgrade project
The Fremantle Harbours Master Plan identified the need to improve facilities for recreational boating in the southern part of Fremantle Fishing Boat Harbour.
Work to upgrade Jetty 3 was completed in 2023 along with the essential preparations for the delivery of the first penholder facility and services upgrade.
DoT is now progressing the construction of the penholder facility on the reclaimed site benefitting both penholders and harbour visitors. Find out about boat pens available at Fremantle Fishing Boat Harbour.
Project status
Phase 1
A $6.2 million contract for Phase 1 works was awarded to local company, Advanteering in October 2022.
The Phase 1 works were completed in September 2023, and include:
- Land reclamation for the Amenities Building, through extension of the southern land-backed wharf, creating an additional 600 square metres of land (approximately).
Completed Land Reclamation for the Amenities Buidling – 03/10/2023
- Installation of upgraded services along the southern edge of Capo D’Orlando Drive.
- Improvements to pedestrian pathways and landscaping, making the southern precinct a more inviting and safer area for the public to access.
Phase 1 safe pedestrian road crossing and landscaping
Phase 1 safe pedestrian footpath and lighting, landscaping
Phase 2
Phase 2 will see the construction of a modern penholder facility in a secure area, in line with marina design standards. Penholders can expect access to the new facility by early 2026.
A $2.9 million contract for the Phase 2 works was awarded to local company, Schlager Group Pty Ltd in June 2024. (see link to Minister’s Announcement).
The contract is for the design and construction of the first dedicated penholder facility at the harbour featuring changing facilities, kitchen and laundry facilities, a dedicated covered BBQ area and accessible toilets – including two that will be available to the public.
The work will also see the creation of storage spaces and an area for trolleys and bins, new fencing and CCTV improvements to boost safety.
Works on site will commence in early 2025, after the completion of the design phase.